  • Physics puts some useful limits on things that can be applied here. All of the water used for cooling is considered wastewater, and it is generally treated chemically in a way that is difficult to process back to clean water. Water has a specific thermal mass, and we can see what hardware is being used in these data centers. From personal experience a flow rate of 1.5L/min is standard. Each rack is limited in power not by how much the supply can put out, but by what they can cool.

    Even doing napkin math with the Blackwell systems that have been out for a couple of years it is as bad as they say and likely worse with the coolants and passivators going into the water.

    I have advised a few water cooled systems, and did some work on Cheyenne in college. Not once was water reclamation even mentioned, it was all pumped right to sewage.


  • despoticruin@lemm.eetoMicroblog Memes@lemmy.worldDual Screen
    link
    fedilink
    English
    arrow-up
    11
    ·
    2 months ago

    These are pretty simple calculators, those switches on top just change how the printing happens. You can set them to print with leading decimals (eg. adding a .00 to monetary values) and alignment to make reading easier. Otherwise it’s just a pretty standard calculator. Great machines, you still see them used for audits as a final hand-calculation stapled to the top of the paperwork.







  • The base looks like a Type S, as far as replacing it with an LED in a DIY fashion the leads are plain old 110v AC. You don’t want to put much more than 5w of LED in there, so you can probably get away with a basic capacitive dropper circuit that matches the LED you choose. Someone mentioned a starter, that is in the bulb base, not the socket on the microscope on these.